Wings Corporate Estates Lot 2
  • Last Updated: January 11 2021
  • Pre-Construction Bid Date: July 1 2020
  • Status: Pre-construction

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    Kyle Smith ksmith@rainericonstruction.com (314) 667-5913 Other      


  • Description:
    • Project Characteristics. The construction of a 14,878 sf story
      office/warehouse building is planned for Lot 2 of the Wings Corporate Drive
      development in Chesterfield, Missouri. The proposed building layout is depicted
      in Figure 1 in the appendix.
      The back half of the building will be
      of steel-frame and concrete tilt-up
      construction, while the front of the structure will be two-story, steel frame, and
      masonry construction. Maximum column and wall loads are expected to be
      approximately 150 kips and 8 kips per lineal f
      oot (klf), respectively. The floor will be
      grade construction, as no basement level is planned. The finished
      floor elevation will likely be similar
      to other buildings within the Wings
      Corporate development, and will be at or near El. 465.50. We anticipate that the
      building pad will require minimal cuts or fills to establish final grades.