Virginia Beach Renovation
  • Street: RESTRICTED
  • City/State: Rockville, Maryland
  • Sq Ft: 8,200
  • Number of rooms/Units: None
  • Building Type: N/A
  • Plans/Drawings: RESTRICTED
  • Last Updated: September 19 2020
  • Pre-Construction Bid Date: September 18 2020
  • Status: Pre-construction

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    RESTRICTED RESTRICTED RESTRICTED Estimating      
    RESTRICTED RESTRICTED RESTRICTED Estimating      
    RESTRICTED RESTRICTED RESTRICTED Estimating      


  • Description:
    • The proposed project expands the existing Demolition Training Compound (DTC) located at NAS Oceana, Dam Neck Annex, in Virginia Beach, VA. The Project constructs a combination one and two story Range Support Facility of approximately 7,440 gross square feet and a single story Grenade Trainer of approximately 800 gross square feet inside the existing DTC. The Range Support Facility will be constructed with reinforced CMU bearing wall framing, slab on grade first floor, and steel bar joists supporting a low slope roof. The Grenade Trainer will be constructed with thick reinforced concrete walls and roof, and supported on a concrete mat foundation that serves as the ground floor. A series of cantilevered reinforced concrete containment walls will surround this center structure. Building 905 will be demolished in order to construct the Range Support Facility in its same general location. Other construction inside the compound will include steel framed breaching wall systems that will surround existing buildings 902 and 903, and a row of breach point door frames on the east side of the Grenade Trainer. Outside the current DTC perimeter at the east end, proposed improvements include a concrete paved open storage/staging area, asphalt paved heavy-duty access road, and 8 light duty asphalt paved POV parking spaces. Utility improvements will include new waterline from the east side of the DTC and new sanitary sewer force main installed on the west side using horizontal directional drilling. Stormwater management that is anticipated to utilize permeable/pervious pavement and infiltration or bioretention basins will be provided at an offsite location within DEVGRU off of Regulus Avenue.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED
Please Login to post comment