Stonecroft Industrial Warehouse
  • Last Updated: January 12 2021
  • Pre-Construction Bid Date: January 11 2021
  • Status: Pre-construction

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    Scott Parker sparker@morgankeller.com (301) 663-0626 Estimating      


  • Description:
    • It is a 105,000 sf  investment warehouse building located in Chantilly, VA. The work to be performed under this bid includes construction of tilt-up concrete, wall bearing building with a steel truss girder bar joist roof structure and all associated site work including retaining walls. CMU sprinkler room, storefront, loading docks, canopies, misc. metals, insulation, TPO roofing SOWs included as well. All other scopes with insufficient information provided will need to be assumed and qualified as such.
      
      MEP scopes are to be subcontractor design build.


General Contractor Information:

Please Login to post comment

Project Updates 8th January 2021 12:06:a.m.

The link to drawings and paint specs are here Scott

posted status: Public