- Last Updated: August 27 2020
- Pre-Construction Bid Date: September 28 2020
- Status: Pre-construction
Suggested Pricing:
-
Project Contact Roles: IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT
A
BID,
PLEASE CONTACT
Contact Name Email Phone Role Emails sent Last date Alex Gregory alex.gregory@ghphipps.com (303) 571-5377 Estimating
- Description:
-
The work consists of a new 63,096 square foot school serving grades K through 5 in Laramie, Wyoming. The new school has a maximum design capacity of 448 students. The school will be constructed on the existing Laramie High School site. The design features three distinct classroom wings, each with pull-out academic space and distributed media areas. The central common area includes special areas such as the Art Room, Music Room and 3D Science Lab. The Gymnasium, formerly a part of the existing Laramie High School, is to remain and be remodeled. The total developed site size for the project is 9-acres. Site development includes playgrounds, playfields, distinct parent and bus drop-off loops, and adequate visitor and staff parking.
-
General Contractor Information:
- Name: GH Phipps Construction Companies
- Address: 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village CO
- GC Phone: (303) 571-5377
- GC Website: http://www.ghphipps.com
- GC Vendor Qualification Application: https://drive.google.com/file/d/17tILXcX2PeMP1Ts3J7ngvA1W9HfsmhCr/preview
- GC LinkedIn: https://www.linkedin.com/company/gh-phipps-construction-companies/
- GC Facebook: https://web.facebook.com/ghphipps/?_rdc=1&_rdr
- GC Twitter: https://twitter.com/ghphipps
Please Login to post comment