SHERATON COLUMBIA TOWN CENTER HOTEL
  • Last Updated: August 19 2020
  • Pre-Construction Bid Date: None
  • Status: Work in progress

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    RESTRICTED RESTRICTED RESTRICTED None      
    RESTRICTED RESTRICTED RESTRICTED Estimating      
  • Status/Contact Role Update:
    Update 1:
    we have already purchased all of the doors, frames and hardware for the project.
    Date: August 05 2020
    Update 2:
    ā€“ as David mentioned we are looking at 212 entry doors and barn doors for the bathrooms. Our current design is below and the reveals are back and front. Entry door would need to have guest lock cut out for the hardware (I have the template) and all hardware would need to be black. Guest room is calling for a 45 min fire rating. Please call me on (202) 560-if you have any questions or need additional information.
    Date: March 09 2020
    Update 3: public space is not awarded for paint. he has guest room painting company already signed up. but costello may not use the same company to do the other pain scope Date: April 13 2020
    Update 4: None Date: None
    Update 5: None Date: None


  • Description:
    • Size: 197,000 SF
      Value Classification: $25M
      
      Costello Construction recently purchased the 290-room Sheraton Columbia Town Center Hotel, located on the Columbia Lakefront in Downtown Columbia, Maryland.
      
      The $25M renovation plans include the addition of two new wings, which will add 76 uniquely appointed guest rooms, upgrading all existing tower rooms, overhauling the HVAC throughout the entire property and adding 6ā€™ wide terraces to all lakefront units. Once complete, the new hotel will feature 212 distinctly designed guest rooms.
      
      Guests will also enjoy a new rooftop pool, a new restaurant, a bar-front terrace overlooking the lake and an exclusive bar/lounge terrace.
      
      The hotelsā€™ two new structural additions, as well as the extensive interior remodeling, will bring the hotel up to a highly-desired four-star Autograph Collection property.
      
      Costello Construction is currently in the construction phase of the project.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED