  • Description:
    • This design-bid-build, multiple phase project includes constructing a new temporary gravel parking lot in the first phase, followed by the construction of the parking garage in the second phase. The garage portion involves the construction of a 173,294SF, 5-level, 469-space pre-cast parking garage, with pre-topped tee(s) with thin-set brick spandrels and stair tower walls. The garage construction includes site demolition, utility relocations and modifications to support the new garage, new electric traction elevator with two elevator shafts, 2 stair towers, heat tracing on the piping systems for freeze protection, security cameras, and car charging stations for electric vehicles. Jarrett is the prime contractor on this project.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED
Please Login to post comment

Project Updates 23rd November 2020 01:19:a.m.

posted status: Public