New England Harvest Dispensary -Clinton
  • Street: RESTRICTED
  • City/State: Clinton, Massachusetts
  • Sq Ft: 28,800
  • Number of rooms/Units: None
  • Building Type: N/A
  • Plans/Drawings: RESTRICTED
  • Last Updated: November 06 2020
  • Pre-Construction Bid Date: March 3 2020
  • Status: 90% contracts purchased

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    RESTRICTED RESTRICTED RESTRICTED Estimating      
    RESTRICTED RESTRICTED RESTRICTED Project Manager      


  • Description:
    • New England Harvest Dispensary Renovation - 28,800 SF Post-Bid Clinton, MA
      Description
      The project consists of the construction and/or renovation of a full-service Cannabis Cultivation Facility as well as a Retail Dispensary Store.  In more detail, the work is the complete renovation of the existing single-story building (with mezzanine), approximately 32,488 SF; new utilities (water, drainage and sewerage), new site modifications (grading, curbing, paving, signage, landscaping and striping).  THE WORK INCLUDES BUT IS NOT LIMITED TO: Demolition, Sitework, Landscaping, Foundations, rebar, slabs, masonry repointing & patching, structural steel, misc. metals, rough carpentry, finish carpentry (millwork), insulation, inspection and recommendations to repair existing skylights, also provide pricing per ALTERNATE #3 for membrane roof system to replace existing skylights (3), Composite Insulated Metal Wall Panels, sealants, doors, frames & hardware, overhead door, entrances & storefront, Madico Private Window film, drywall, acoustical ceiling, Dex-O-Tex Urethane Concrete Flooring, carpeting, porcelain tile, VCT flooring, Static Dissipating Tile, vinyl luxury plank, painting and wall-covering, signage, Tufftec 2-tier lockers, toilet partitions, toilet accessories, awnings, fire protection, plumbing (include removing floor drain covers and cleaning out floor drain lines to ensure flow), HVAC and electrical.
      
      NOTES:
      1)     OPEN SHOP PROJECT.
      2)     Pre-Bid walk through Wednesday, February 19, 2020 @ 11:00 AM.
      3)     Each trade (sub) will submit SEPARATELY a bid proposal for each project (Cultivation Facility and Retail Dispensary Store).
      4)     SUB BIDDERS must refer to the RESPONSIBILITY SCHEDULE on drawing G102 for what is to be included in their quotes.
      5)     Roofers to review MEP plans that show vents and fans not shown on A plans, for flashing and counterflashing.
      6)     NOTICE the REQUIRED VENDORS on drawing G102; all bidders must comply.  NO Substitutions. Namely:
      
      7)     Any questions must be submitted on or before Tuesday, February 26, 2020.
      8)     ALTERNATES:
      CULTIVATION ALTERNATES:
      1)     ALTERNATE #1: In lieu of Norbec wall panels and ceiling panels. Provide walls with GWB on both sides of 3 5/8" metal studs. Air sealed partition (see partition schedule). Full height FRP panels - refer to finish schedule. Ceiling panels to be ACP clean room type.
      2)     ALTERNATE #2: Storage platform area over mechanical and electrical area with ships ladder for access. Provide cost to install footings and foundations to support proposed platform above Mechanical and Electrical room. Geotechnical information Is not available at this time so assume existing soils with proper bearing capacity to support proposed storage area.
      3)     ALTERNATE #3: demolish existing skylights and infill opening as indicated on the Structural drawings. Provide patched EPDM roof membrane so not to void existing roof warranty.
      4)     ALTERNATE #4: omit gasketed ceiling from the entirety of the work. Provide ACP Ceilings as scheduled without gasketed option.
      RETAIL ALTERNATE:
      1)     ALTERNATE 1: Change existing Staff Break Room Lights to 4' LED Strip with Lens.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED
Please Login to post comment