- Last Updated: December 12 2020
- Pre-Construction Bid Date: February 26 2020
- Status: Complete
Suggested Pricing:
-
Project Contact Roles: IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT
A
BID,
PLEASE CONTACT
Contact Name Email Phone Role Emails sent Last date Doug Bohr dougb@rcwegman.com (630) 844-3000 None
- Description:
-
R.C. Wegman Construction Company will be submitting a bid for the interior renovations at Kishwaukee College. This project is split up into (3) different areas: Locker Rooms Renovation, IT Offices Renovation, and the Early Childhood Learning Center Renovation. I will need separate pricing for each different area on your quote, along with one combined price to do all three areas. See below for disciplines needed. LOCATION: Kishwaukee College: 21193 Malta Road, Malta, IL 60150 SCHEDULE: Start: March 16, 2020; Locker Rooms complete by July 31, 2020; IT Offices and Early Childhood Learning Center complete by June 19, 2020. NOTES: This project is tax exempt. Selective Demolition, Concrete, Hydraulic Cement Underlayment, Masonry, Cold-Formed Metal Framing, Pipe and Tube Railings, Architectural Millwork, Fluid Applied Membrane Air Barriers, Resinous Z-Girt Framing, Sheet Metal Flashing and Trim, Hollow Metal Doors & Frames, Flush Wood Doors, Automatic Door Operators, Mirrors, Fire-Rated Glazing and Framing Systems, Door Hardware, Gypsum Board Systems, Acoustical Ceilings, Ceramic Tiling, Resilient Base & Accessories, Resilient Sheet Flooring, Resinous Flooring, Tile Carpeting, Painting, Visual Display Units, Stainless-Steel Toilet Compartments, Toilet, Bath & Laundry Accessories, Fire Extinguishers & Cabinets, Gymnasium Equipment, Athletic Lockers, Plastic-Laminate-Clad Countertops, Solid Surfacing Countertops, Plumbing, HVAC, Electrical, Fire Alarm
-
General Contractor Information:
- Name: RC WEGMAN CONSTRUCTION COMPANY
- Address: 750 MORTON AVE AURORA IL
- GC Phone: (630) 844-3000
- GC Website: http://www.rcwegman.com/
- GC Vendor Qualification Application: None
- GC LinkedIn: None
- GC Facebook: https://www.facebook.com/rcwegmanconstruction/
- GC Twitter: None
Please Login to post comment
Project Updates 4th November 2020 04:02:a.m.