Hangar 250 Repairs & Improvements
  • Street: RESTRICTED
  • City/State: Cherry Point, North Carolina
  • Sq Ft:
  • Number of rooms/Units: None
  • Building Type: Military
  • Plans/Drawings: RESTRICTED
  • Last Updated: June 04 2020
  • Pre-Construction Bid Date: None
  • Status: Work in progress

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    RESTRICTED RESTRICTED RESTRICTED Project Manager      
  • Status/Contact Role Update:
    Update 1:
    None
    Date: None
    Update 2:
    None
    Date: None
    Update 3: None Date: None
    Update 4: None Date: None
    Update 5: None Date: None


  • Description:
    • Location
      MCAS, Cherry Point, NC
      
      
      The work includes the following and incidental related work:
      a. Asbestos abatement throughout building to include roof panels and
      exterior asbestos coated metal wall panels.
      b. Replacing the HVAC system in its entirety.
      c. Replacing all plumbing fixtures.
      d. Replacing the interior and exterior lights, not including hangar
      bay high bay fixtures.
      e. Installing translucent fiberglass skylight in center area.
      f. Upgrade the sprinkler and fire alarm system.
      g. Replacing all wall, floor and ceiling finishes in all spaces except
      hangar bays. This includes resealing hangar bay floors.
      h. Reconfiguring most spaces to include the demolition of interior
      walls and installation of new walls.
      i. Replacing doors and frames, windows and frames, and door hardware.
      j. Painting all exposed interior and exterior surfaces.
      k. Removing and replacing the southern wall to meet the Antiterrorism
      Standards.
      l. Removing and replacing the northern wall to incorporate new
      exterior finishes.
      m. Install new roof deck over hangar bays and install new PVC roof
      systems complete.
      n. Relocate the secure fence and install a new personnel turnstile
      access.
      o. Install two (2) new security checkpoint for vehicles entering the
      existing parking lot on the south end of the facility.
      p. Indentify and document the existing striping on the hangar bay floor and
      reinstall the striping to match the existing.
      q. Apply inspection stickers to all grounding points.
      THE FOLLOWING ITEMS ARE NOT INCLUDED IN THIS PROJECT EVEN THOUGH THEY ARE
      SHOWN ON THE DRAWINGS:
      A. REPLACEMENT OF ENTIRE ROOFING SYSTEM OTHER THAN CENTER SECTION ABOVE
      FIRST FLOOR MAINTENANCE SHOPS (DETAIL 1 ROOF PLAN ON NAVFAC DRAWING
      12714195).
      B. INSTALLATION OF NEW LIGHTNING PROTECTION SYSTEM. NEW ROOF TOP EQUIPMENT
      SHALL BE BONDED TO EXISTING LIGHTNING PROTECTION SYSTEM.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED