Hampton Apartments
  • Street: RESTRICTED
  • City/State: Hampton, Virginia
  • Sq Ft: 174,000
  • Number of rooms/Units: None
  • Building Type: N/A
  • Plans/Drawings: RESTRICTED
  • Last Updated: August 27 2020
  • Pre-Construction Bid Date: None
  • Status: Pre-construction

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    RESTRICTED RESTRICTED RESTRICTED Estimating      
  • Status/Contact Role Update:
    Update 1:
    Here is the link to the phase II for paint.
    Date: July 30 2020
    Update 2:
    See below link to the Phase I plans for windows treatment
    Date: June 16 2020
    Update 3: Hampton Apartments Phase I is a new construction build. Hampton Apartments Phase II is half new build and half existing building. There is no way to get you in the existing portion at the moment. You could however, drive by the site. We are expecting better Phase II drawings this Thursday. Touch base with me Thursday and I will send you the latest plans to look at. Date: July 21 2020
    Update 4: We have not awarded painting yet. We are still trying to get our contract finalized with the owners. It will probably be another 2-3 weeks before we can release any subs. Date: August 27 2020
    Update 5: None Date: None


  • Description:
    • The planned redevelopment will
      consist two buildings with retail and
      commercial on the ground floor
      and apartments above. Building A (total units 133) 142,242
      is to be a four to six-story structure
      consisting of a one-story concrete
      podium and three to five-story
      levels of wood framing above.
      
      Building B(total units 29) 31,409 is to be a three-story structure consist
      ing of a one-story concrete podium and
      two levels of wood framing. The structures will be
      supported by systems concrete
      columns and CMU walls carrying maximum loads of 350
      kips and 4 kips per linear ft.,
      respectively
      
      https://www.dropbox.com/sh/sall5ayuk5eogyc/AABhyQfukJ0vRd2nsVwFeAiNa?dl=0&preview=Hampton+Apartments+Site+Plan+2020-02-21.pdf
      
      
      
      KBS, Inc. is actively working with WVS Companies on the Hampton Apartments project.  This project is still set to start in July.  We just received plans and specifications for the Phase II portion of the Hampton Apartments.  The owners have decided to build Phase I and Phase II simultaneously, which we feel is the most cost effective strategy.  Below is a link to the pricing set of drawings for Phase II.
      
      https://www.dropbox.com/sh/wjkrfoem5nan1c6/AACIpIS0f7cEg5q0EhSRYBwKa?dl=0
      
      These drawings are not as far along as the Phase I drawings, however we should be able to revert back to Phase I to answer any pending design/detail questions.  Phase II consists of (29) apartment units and totals 31,409 SF.  Please notice roughly 7,920 SF of this building is existing and will be renovated as part of the project.  This should be a fairly straight forward addition to the Phase I pricing.  KBS would like pricing back no later than the end of the day June 15th, 2020.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED