H-Style Buildings
  • Street: RESTRICTED
  • City/State: Camp Lejeune, North Carolina
  • Sq Ft:
  • Number of rooms/Units: None
  • Building Type: N/A
  • Plans/Drawings: RESTRICTED
  • Last Updated: September 10 2020
  • Pre-Construction Bid Date: None
  • Status: 90% contracts purchased

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    RESTRICTED RESTRICTED RESTRICTED Other      
    RESTRICTED RESTRICTED RESTRICTED Other      
    RESTRICTED RESTRICTED RESTRICTED Other      
  • Status/Contact Role Update:
    Update 1:
    We have a project out at Camp Lejeune, NC that I would like you to bid drywall on. Can you please give me a call when you get a chance.
    Date: December 03 2019
    Update 2:
    I received your email inquiring about Building 308. We actually have 4 H-Style Buildings that we have been award that all start at the same time. If you would like to price up all these buildings that would be great.
    
    I notice that you are also a drywall and metal stud company as well as ceilings. Would you be interested in pricing these items up as well?
    Date: January 02 2020
    Update 3: Drawings can be downloaded here. I would like a price for rough clean and final clean standard services. Buildings will be ready for final clean starting June 2021. Please note there are 4 buildings Date: September 10 2020
    Update 4: The HVAC System was bought out already. Thank you. If you would like to be part of the next project we bid, here is the contact for our estimator LEED® Green Associate™ l Senior Project Engineer Date: January 06 2020
    Update 5: we have everyone locked in Date: May 20 2020


  • Description:
    • Here are a couple notes we talked about as well along with a scope review sheet I would like you to look over and make any comments to:
      
      Please bid as though you will be doing/working in all buildings together at one time.
      If possible please break out each building into it own lump sum – This way if you cannot provide that amount of laborer then maybe we can agree a one or two buildings
      When talking interior work:
      Looking at the spec as it calls out level 5 finish is some areas
      Securing load bearing columns and moving/adding them
      Wet areas – Showers, Restrooms
      Secure rooms – Mesh needed in Building 312
      
      https://drive.google.com/open?id=11y190DV4gooYJ9JaVLZB-h206ubXR45l


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED