C-17 Refueling Hydrant System Ramp Expansion
  • Street: RESTRICTED
  • City/State: Charlotte, North Carolina
  • Sq Ft:
  • Number of rooms/Units: None
  • Building Type: N/A
  • Plans/Drawings: RESTRICTED
  • Last Updated: August 14 2020
  • Pre-Construction Bid Date: None
  • Status: Work in progress

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role Emails sent Last date  
    RESTRICTED RESTRICTED RESTRICTED Other      
    RESTRICTED RESTRICTED RESTRICTED Other      
    RESTRICTED RESTRICTED RESTRICTED Project Manager      
    RESTRICTED RESTRICTED RESTRICTED Project Manager      
  • Status/Contact Role Update:
    Update 1:
    Yes I am Sir, and Deb V is the Project Manager for the job.  So please reach out to her, and she will be of better assistance than I will be as she is on-site.  Please call me so we can discuss,
    
    Thank you -
    
    Mike H
    Date: July 08 2020
    Update 2:
    None
    Date: None
    Update 3: None Date: None
    Update 4: None Date: None
    Update 5: None Date: None


  • Description:
    • Bodell Construction’s ace team is prepping now for project start up and is expected to be completed by December 2020.
      
      North Carolina Air National Guard’s C-17 Refueling and Ramp Expansion is progressing nicely.
      
      Notable action occurring on site this month while working with Parker Crane to place and bolt in structural steel columns, girts, and bracing for the pump shelter building. In addition, the five filter separators are set, apron grading now placed, and the warm spring weather in Charlotte, has been a bonus. This essential project like all our others are adhering to strict COVID 19 safety measures at the job site for the protection of overall health.
      
      The 145th Airlift Wing 4930 Minuteman Way Charlotte, North Carolina intends to issue an Request for Quote to award a single firm fixed-price contract for services,
      non-personal, to provide all plant, labor, transportation, materials, tools, equipment, and supervision necessary for the Construction of a C-17 Type III Hydrant Refueling System/Ramp Expansion Charlotte, NC. This project includes a DoD Type III Pump Shelter to accommodate fuel pumps, associated equipment, a
      Control Room, and support spaces. Conventional Shallow Spread Footing Foundation System. The Pump Shelter area will be covered by a pre-engineered metal building structure. The Pump Room will be open air with no surrounding exterior walls, while the Control Room and support areas (Unisex Toilet and Mechanical Room) will be consolidated within a fully enclosed area with steel studs and CMU veneer. Standing seam metal roofing. DX Cooling with heat pump air system. Medium voltage and communications concrete encased duct banks. Structural rigid airfield paving, heavy duty flexible paving, standard flexible and rigid paving. Gabian basket retaining walls. Relocation of existing sparge system. Stainless steel and coated carbon steel fuel piping, 4+1 in-ground refueling pits, isolation valve pits, and cathodic protection. 4000 barrel fuel storage tank, containment and controls. Modification of 2 existing 2500 barrel tanks, containment and controls. Airfield markings, tie-downs, grounding and lighting modifications.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED