Rhodes State Office Tower

  • Street: RESTRICTED
  • City/State: Columbus, Ohio
  • Sq Ft:
  • Number of rooms/Units: None
  • Building Type: None
  • Plans/Drawings: RESTRICTED
  • Last Updated: May 05 2020
  • Pre-Construction Bid Date: None
  • Status: Project in progress-GC awarded

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role
    RESTRICTED RESTRICTED RESTRICTED Project Manager  
    RESTRICTED RESTRICTED RESTRICTED Other  
    RESTRICTED RESTRICTED RESTRICTED Project Manager  
  • Status/Contact Role Update:
    Update 1:
    The Rhodes Tower project is being handled by our Ohio office. Jeff Berglund is the contact
    Date: April 09 2020
    Update 2:
    We do not have any painting needs at Rhodes Tower.
    Date: April 14 2020
    Update 3: there is no door and hardware scope. Date: May 05 2020
    Update 4: None Date: None
    Update 5: None Date: None


  • Description:
    • Berglund Construction has a reputation for solving the most challenging logistics and access challenges to restore building facades. At the 41-story Rhodes State Office Tower in Columbus, Ohio, we are using state-of-the-art mast climbers and suspended scaffold systems to reach every granite panel on the building.
      
      The mast climber system allows us to reach more than 100 feet of the building on its platform. The project requires two spans of mast climber platforms for access: One on the west elevation, which we installed earlier this year, and one on the south elevation, which we’re in the process of installing. The electric-powered mast climber platform creates a sustainable, efficient workspace for our tradespeople to remove and reset large granite panels.
      
      The suspended scaffold systems are rigged with all traction hoists and cable winders on the roof. This innovative system increases the capacity of the platforms to 3,000 pounds – facilitating the removal and replacement of large granite panels in hard to reach places. Our tradespeople have setup eight of them with different configurations around the building.
      
      We began work at Rhodes Tower in the fall of 2018. The project will be completed in 2021.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED