Mulcahaey Elementary School- union labor

  • Street: RESTRICTED
  • City/State: Taunton, Massachusetts
  • Sq Ft: 200,000
  • Number of rooms/Units: None
  • Building Type: None
  • Plans/Drawings: RESTRICTED
  • Last Updated: May 22 2020
  • Pre-Construction Bid Date: None
  • Status: Project in progress-GC awarded

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role
    RESTRICTED RESTRICTED RESTRICTED Project Manager  
    RESTRICTED RESTRICTED RESTRICTED Other  
    RESTRICTED RESTRICTED RESTRICTED Other  
    RESTRICTED RESTRICTED RESTRICTED Superintendent  
    RESTRICTED RESTRICTED RESTRICTED Project Manager  
  • Status/Contact Role Update:
    Update 1:
    We are at the point where we are collecting bids for the final cleaning scope.  I attached the scope here, but also wanted to provide the architectural and food service plans for your reference to help put your bid together.  That file of plans was about 100mb so I could not attach it to an email.  Instead, I used wetransfer.com and created this link for you to download the file.
    
     
    
    There are some filed-sub bid trades that own some cleaning work of their scopes. S
    Date: May 06 2020
    Update 2:
    Painting was a Filed Sub Bid trade that went through a whole separate bidding process.
    Date: January 14 2020
    Update 3: Thanks for the interest but we have not even finished setting up temp fence. Check back 1 year from now. Date: March 11 2019
    Update 4: Under the Special notes near the end of the scope it does state we need Union labor on this and asks for an estimated quantity of labor hours. per the code plan in the drawing set (GC1.00) they split it into only buildings A and B even though the final design ahd considered it 3 areas (A, B & C). They show the SF in the 118,000 range, but without doing the math, I’d say more like 150,000 to be safe. Date: May 07 2020
    Update 5: Job is well underway. Electrician was a filed sub bidder. Date: February 24 2020


  • Description:
    • Councilors were mostly receptive to the chosen design, which will separate grades by floor in a three-story “core academic” section of the red brick, 200,000-square-foot “L”-shaped building.
      
      New, 119,693 SF Elementary School for the City of Taunton, MA.  The new school will be a combination of a one-story building with core areas for the art and music classrooms, gymnasium, cafeteria and associated kitchen and support spaces, and a three-story classroom wing that will include a 1-1/2 story media center and administration offices. The construction type will be II-B, with a combination of steel frame construction and masonry bearing wall construction at the gymnasium area. A fire wall will bisect the project into two buildings.
      
      Exterior finishes will include brick and cast stone masonry with limited areas of fiber cement panel siding. Windows and entrances will be aluminum framed systems. Roofing will be low-slope single-ply membrane throughout, with a combination of metal and prefabricated FRP cornices.
      
      The new school has been sited to allow for the on-going use of the existing school; phased construction will be required to complete the new construction, provide temporary site features, and complete demolition and remaining site work once the new structure is complete and occupied by the Owner.
      
      The new school is registered with a goal to receive LEED Silver certification under the LEED-S v4 rating system.
      
      clean scope
      https://final-clean.my.salesforce.com/sfc/p/E0000000Iuwz/a/2R0000006EDv/4rAjSMMxrpIH_7cHXzM.X880FnOq4nluH07UJYE90ys


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED