GSU Dahlberg Hall 1st Floor, Veterans Memorial Hall Renovation

  • Street: RESTRICTED
  • City/State: Atlanta, Georgia
  • Sq Ft: 3,900
  • Number of rooms/Units: None
  • Building Type: None
  • Plans/Drawings: RESTRICTED
  • Last Updated: April 05 2020
  • Pre-Construction Bid Date: March 30 2020
  • Status: GC not awarded

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role
    RESTRICTED RESTRICTED RESTRICTED None  
  • Status/Contact Role Update:
    Update 1:
    None
    Date: None
    Update 2:
    None
    Date: None
    Update 3: None Date: None
    Update 4: None Date: None
    Update 5: None Date: None


  • Description:
    • orgia State University is currently renovating a 3,900 SF auditorium at 30 Courtland Street SE, located at the intersection of Courtland Street and Gilmer Street.   The name of the space is Veterans Memorial Hall.  It is located in Dahlberg Hall.  Multiple types of events are hosted in this space by various GSU departments and external organizations.   This building was opened in 1909.  The marble facade was after 1940.  Georgia State University purchased this building in 1979.   The memorial hall is dated and needs to be updated/renovated.
      
      The scope of work for this project will include a facelift renovation of the existing Veterans Memorial Hall in Dahlberg Hall.   The facelift will include new flooring, ceiling, paint, audio/video system, lighting, rigging for theatrical lighting, a new stage, and other updates needed to complete the project and bring area up to code.   The scope of work includes the demo of; ceiling, flooring, and wall finishes that are needed for design purposes.  Mechanical and electrical work will be required for the redistribution of mechanical and electrical with new ceiling.   Construction of this phase could overlap with on-going work of other floors in the building.  Coordination with the designer, construction manager and other trades and consultants already on site and in the building will be required.  
      
      During pre bid walk it was mention by GSU that duct work contained asbestos.   GSU has a specialized contractor to demo ductwork and ceiling at this time.
      
      Construction should start approx April 28th and complete July 22nd.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED