EDGEWOOD CENTER

  • Street: RESTRICTED
  • City/State: Atlanta, Georgia
  • Sq Ft: 41,313
  • Number of rooms/Units: None
  • Building Type: None
  • Plans/Drawings: RESTRICTED
  • Last Updated: July 01 2020
  • Pre-Construction Bid Date: None
  • Status: Project in progress-GC awarded

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role
    RESTRICTED RESTRICTED RESTRICTED Project Manager  
    RESTRICTED RESTRICTED RESTRICTED Estimating  
    RESTRICTED RESTRICTED RESTRICTED Project Manager  
  • Status/Contact Role Update:
    Update 1:
    We have not but we have already selected a painter for the project.
    Date: April 15 2020
    Update 2:
    Please see attached bid invite for Masonry and the current Davis Bacon Wage Scale. This project requires Davis Bacon wages and documentation. The project will start April 6, 2020 and will be complete by December 31, 2020. This project has been awarded to Lusk. Please see below the dropbox link for drawings and specifications.
    Date: January 14 2020
    Update 3: we have already selected for window treatments the contractor and received the submittals. Date: June 16 2020
    Update 4: I am the project manager for the Edgewood Project and Brent is the project manager for Home 2 Suites. Both of these have already been issued to a subcontractor, our goal is to have someone signed up before the project starts. It would be waste of your time to review the drawings. Allen Calhoun is our Chief estimator so, please reach out to him if you would like to be placed on our bid list. allen@.com Date: June 18 2020
    Update 5: There is no concrete on this project because it is a interior renovation project.- project breaks ground/ starts in july. takes 10 months to complete. yes can still submit a clean price- Date: May 22 2020


  • Description:
    • There will be demolition, exterior fire line, gypcrete  brick veneer  miscellaneous steel, wood framing, lumber, lvl’s, millwork (unit kitchens), air barrier, EIFS, Membrane roofing, skylight, caulking, doors and hardware, storefront, drywall, tile, acoustical ceiling, resilient, painting,  toilet accessories signage, prefabricated canopy, kitchen appliances, blinds, plumbing, hvac , fire protection, electrical. These drawings and specifications are available at LDI on file and our FTP site http://drawings.luskco.com  username; lusk-ftp and password ftp-guest2009. The project at this time is occupied and you can go by there anytime to view the existing conditions.
      
      
      This is a project that had been awarded to Lusk and going to start no later than November 2019 and the addition will be built first and completed than the interior renovation will be done. The total construction schedule is 12 months for this project. Please let me know if you are going to bid this project for us.


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED