Annapolis Cottages

  • Street: RESTRICTED
  • City/State: ANNAPOLIS, Maryland
  • Sq Ft: 14,000
  • Number of rooms/Units: None
  • Building Type: None
  • Plans/Drawings: RESTRICTED
  • Last Updated: June 24 2020
  • Pre-Construction Bid Date: None
  • Status: Project in progress-GC awarded

Suggested Pricing:

  • Project Contact Roles:    IN ORDER TO OBTAIN BID DOCUMENTS AND SUBMIT A BID, PLEASE CONTACT
    Contact Name Email Phone Role
    RESTRICTED RESTRICTED RESTRICTED Other  
    RESTRICTED RESTRICTED RESTRICTED Other  
  • Status/Contact Role Update:
    Update 1:
    Wage Deturmination - Annapolis.txt
    
    https://lifecyclefiles.egnyte.com/dl/V8qSESCxIp
    Date: January 14 2020
    Update 2:
    We are looking for subcontractor to perform the painting scope at Annapolis. Project recently started construction. Any chance you would be interested? Prevailing wage and certified payroll project. We would need a proposal back next Friday and we are looking to write a contract immediately. Project has begun construction. Work anticipated to start in late August/September.
    Date: April 02 2020
    Update 3: Project is still moving. Painting anticipated start is August/September. I would need a more clear breakout of pricing labor and material. Any way you can work up a scope like this for the 6 duplexes, 4 single cabins and 1 support building? slabs are not poured. paint will be looked at in may ish . but not installed or mobilized until late aug Date: April 20 2020
    Update 4: yes sir. Send me a cleaning proposal Date: May 20 2020
    Update 5: Cleanup proposal Not needed at this time Date: June 24 2020


  • Description:
    • 6 duplex units (12 cabins total)
      
      4 single cabins (1 is ADA)
      
      1 Support building
      
       
      
      This link has the specs, drawings, wage scale.                                         
      
      https://lifecyclefiles.egnyte.com/fl/vylpowAlPF
      
      Price with prevailing wage scale.
      
      PROJECT DETAILS
      
      This proposal covers the specifications for the interiors and exteriors of the Cottages #2A, 2B, 3A, 3B, 5A, 5B, 6A, 6B, 8A,
      
      8B, 9A, 9B.
      
      This proposal covers the specifications for the interiors and exteriors of the Cottages #1, 4, 7, and 10 ADA.
      
      The pricing listed below is for one (1) unit only.
      
      The major specifications of the project are as follows
      
       
      
      INTERIOR:
      
      1. Apply one (1) coat of primer and backroll to the ceilings, walls, baseboards, bathrooms, closets, doors, door frames,
      
      and window frames in the Great Room, Kitchen, Laundry Room, Bedroom 1, Closet, Bedroom 2, Closet, Hall, and Hall
      
      Bathroom.
      
      2. Apply the same preparation and painting to the interior of the Mechanical Room.
      
      3. Apply two (2) coats of paint to all the ceilings, walls, baseboards, bathroom, closets, doors, door frames, and window
      
      frames in all the rooms listed above.
      
       
      
      EXTERIOR:
      
      3. Apply an ECO friendly light bleach solution or cleaner to remove the dirt on the entire exterior surfaces of the
      
      houses louvers, soffits, fascia, door, door frames. window frames, and railing.
      
      4. Apply two (2) coats of paint to the louvers, soffits, fascia, door, door frames. window frames, railing, and ceiling in
      
      the Patio.
      
      6. Drop Cloths on ALL concrete, deck, asphalt and porch areas.
      
      The total project cost includes labor and materials.
      
       
      
      SUPPORT BUILDING
      
      INTERIOR:
      
      1. Apply one (1) coat of primer and backroll to the ceilings, walls, baseboards, doors, door frames, and window frames in the Break Room, Office, Communication Room, and Restroom.
      
      2. Apply the same preparation and painting to the interior of the Mechanical Room.
      
      3. Apply two (2) coats of paint to all the ceilings, walls, baseboards, doors, door frames, and window frames in all the rooms listed above.
      
       
      
       
      
      EXTERIOR:
      
      4. Apply an ECO friendly light bleach solution or cleaner to remove the dirt on the entire exterior surfaces of the soffits, fascia, doors, door frames, and window frames.
      
      5. Apply two (2) coats of paint to the soffits, fascia, doors, door frames, and window frames. 
      
      6. Drop Cloths on ALL concrete, deck, asphalt and porch areas.
      
      
      We adhere fully to all federal contracting requirements.  Certified Payroll, and Davis Bacon Wages.  We use wage rates from http://www.wdol.gov/dba.aspx
      
      
      PAIN0051-024 06/01/2017
      
                                        Rates          Fringes
      
      PAINTER  
           Brush, Roller, Spray, 
           Drywall Finisher/Taper and 
           Paperhanger.................$ 25.06             9.66
           Industrial..................$ 30.90            10.49


General Contractor Information:

  • Name: RESTRICTED
  • Address: RESTRICTED
  • GC Phone: RESTRICTED
  • GC Website: RESTRICTED
  • GC Vendor Qualification Application: RESTRICTED
  • GC LinkedIn: RESTRICTED
  • GC Facebook: RESTRICTED
  • GC Twitter: RESTRICTED